2.1.4 Appoint Project Team

At this point the scope of the project has been defined in detail and the project team are ready to be appointed. Although a Project Manager can be appointed at any stage of the project, s/he will need to be appointed prior to the establishment of the project team. The Project Manager documents a detailed Job Description for each project role and appoints a human resource to each role based on his/her relevant skills and experience.Once the team are ‘fully resourced’, the Project Office is ready to be set-up.

2.1.5 Set up Project Office

The Project Office is the physical environment within which the team will be based. Although it is usual to have one central project office, it is possible to have a ‘virtual project office’ environment, with project team members in various locations around the world. Regardless of the location, a successful project office environment will comprise the following components:

▪ Location (either physical or virtual)

▪ Communications (telephones, computer network, email, internet access, file storage,database storage and backup facilities)

▪ Documentation (methodology, processes,forms and registers)

▪ Tools (for accounting, project planning and risk modeling).

2.1.6 Perform Phase Review

At the end of the Initiation Phase, a Phase review is performed. This is basically a checkpoint to ensure that the project has achieved its stated objectives as planned.